Approx. Get Latest Price
Product BrochureService Details:Minimum Order Quantity | 60 Meter |
Usage/Application | Water well services |
Type Of Contractor | Borewell Drilling |
Construction Type | Company |
Service Duration | 1-2 Week |
Service Location | All India |
Service Mode | Offline |
Service Type | Borewell Contractor |
BOREWELL point selection is the very first process required in construction of a borewell people pronounce this process in various ways such as Borewell point marking, Borewell point identification, Borewell point selection, Borewell point detection, water dowsing, water witching, hydro-geologist survey, geologist survey, scientific survey, coconut borewell point marking and many other pseudo names.
But borewell point identification is widely divided into two major methods which are differentiated as pseudoscientific method and scientific method.The drilling process complex as it may be rotate about breaking the ground and
lifting the rock cuttings from the resulting hole. The ultimate geothermal drilling
objective is to access the resource for exploitation. However, during resource
development and exploitation, drilling is used to confirm existence of the resource,
obtain data for resource assessment, provide adequate steam fuel for the power
plant and resolve well production complications. Tri-cone tungsten carbide insert
bits are very often used in geothermal drilling. Mobile and conventional land rigs
are predominantly used in the geothermal drilling industry. The rigs are selected to
technically fit the job at the lowest cost possible. The wells are made useful by
casing them. Several casing string are used for each well. They are cemented to
bond them to formation. Large production casing of 13 3/8” casing is increasing
becoming common where large well outputs are encountered and directional
drilling is being employed to target major faults that transmit fluids.
Additional Information:
Approx. Rs 700 / MeterGet Latest Price
Product BrochureService Details:Minimum Order Quantity | 60 Meter |
Service Sector | Infrastructure and industrial projects |
Site Location | Pan India |
Dimension / Size | 600 Meter |
Technology | Water well Drilling |
Duration | 1-2 Week |
Service Location | All India |
Service Mode | Offline |
Service Type | Borewell Installation |
Additional Information:
Approx. Rs 900 / MeterGet Latest Price
Product BrochureService Details:Minimum Order Quantity | 100 Meter |
Site Location | Pan India |
Type | Water well drilling Services |
Dimension / Size | 600 Meter |
Service Sector | infrastructure projects and Industrial Application |
Service Duration | 1-2 Week |
Service Mode | Offline |
Service Type | Borewell Drilling Service |
We are offering Borewell Drilling Service with our capacity of drilled water well up to a maximum of 27 inches in diameter, and up to 1500 feet depth. We cater to varied different types of drilling of varied formulations. Our organization has successfully executed work on some of the most difficult underground formations in India. With the aid of our infrastructural set up, we have executed the works in most of the areas with the maximum capacity.The drilling process complex as it may be rotate about breaking the ground and
lifting the rock cuttings from the resulting hole. The ultimate geothermal drilling
objective is to access the resource for exploitation. However, during resource
development and exploitation, drilling is used to confirm existence of the resource,
obtain data for resource assessment, provide adequate steam fuel for the power
plant and resolve well production complications. Tri-cone tungsten carbide insert
bits are very often used in geothermal drilling. Mobile and conventional land rigs
are predominantly used in the geothermal drilling industry. The rigs are selected to
technically fit the job at the lowest cost possible. The wells are made useful by
casing them. Several casing string are used for each well. They are cemented to
bond them to formation. Large production casing of 13 3/8” casing is increasing
becoming common where large well outputs are encountered and directional
drilling is being employed to target major faults that transmit fluids.
Additional Information:
Approx. Rs 600 / MeterGet Latest Price
Product BrochureService Details:Minimum Order Quantity | 60 Meter |
Site Location | Pan India |
Type | Water Well drilling |
Dimension / Size | Upto 600 Meter |
Service Sector | Infrastructure projects and Industrial Application |
Service Duration | 1-2 Days |
Machine Type | Water well drilling Rig |
Service Mode | Offline |
Service Type | Commercial Borewell Drilling Services |
Additional Information:
Explore More Services
© Hitech Drilling Engineers. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited